PROJECT PORTFOLIO
Location: Route D, Route E, and Route 75
Size: Various Jobs
Value: $3,870,860.65
Job J9S3641 Route D NEW MADRID County. Bridge replacement over Drainage Ditch No. 1, the total length of improvement being 0.103 miles.****(2): Job J9S3723 Route E NEW MADRID County. Bridge replacement over Otter Slough Drain Ditch, the total length of improvement being 0.0644 miles.****(3): Job J9S3724 Route D NEW MADRID County. Bridge replacement over Drainage Ditch No. 1, the total length of improvement being 0.0568 miles.****(4): Job J9S3769 Route 75 MISSISSIPPI County. Bridge replacement over Wolf Hole Lateral Drainage Ditch, the total length of improvement being 0.0568 miles.
MORE PROJECTS
♦
