Modot - Bollinger County Route 51
Location: Patton, Missouri (1.5 Miles South of Patton Junction on Highway 51)
Size: 310′ bridge, 1100′ highway, 5000yd3 of fill material
Value: $1,470,828.88
Work began in June 2015 to construct a new 310 ft bridge over the Little Whitewater River and realign approximately 1100 lineal feet of Highway 51 in Patton, MO. This project will eliminate a very sharp curve near the existing bridge and provide for a much safer route and river crossing. This environmentally sensitive project includes approximately 5000 cubic yards of fill material including the relocation of a county road entrance with grading and drainage structures. The project will also include the demolition and removal of the existing bridge.